Quantities and Index Linkage
In a contract by quantities the item quantities are compared with the budget. In a linked contract the index linkage is calculated.
In this article
- Lump sum or by quantities
- Comparing quantities
- Index linkage
Lump sum or by quantities
You can choose by hand on the Quantities tab. Without a choice, the system decides in this order: a clause that says lump sum; otherwise a breakdown of quantities in the contract means by quantities; otherwise a clause that makes the price follow quantities; and a price with no breakdown means lump sum. The screen always says what decided it.
A lump-sum contract is checked by its amount against the budget only.
Comparing quantities
- Add a line (description, quantity, unit, and a unit price and clause number if needed) and link it to a budget item, or add lines found in the contract clauses. A budget item is suggested by unit and description; check it before saving.
- Several contracts on one budget item are summed.
- Both more and less than the budget are marked for checking. A different or missing unit is not compared.
- The comparison is available to those who may view the budget, in a project with a budget subscription.
Index linkage
- The indices: residential construction input, commercial and office construction input, road and bridge input, and consumer prices.
- The index is recognised from the indexation field or an approved indexation clause, or chosen by hand. Unclear wording, or "not linked", is not taken as an index.
- The base date is the signing date, and you can set another one.
- The calculation uses the linkage calculator of the Israeli Central Bureau of Statistics, and shows the base index, the current index, the linked amount and the difference.
The linkage formula in the contract (floor, ceiling, payment dates) may differ. Check it against the contract.